1
REPORTABLE
IN THE SUPREME COURT OF INDIA
CIVIL APPELLATE JURISDICTION
CIVIL APPEAL NO. 5785 OF 2019
IREO GRACE REALTECH PVT. LTD. … Appellant
Versus
ABHISHEK KHANNA & OTHERS … Respondents
with
CIVIL APPEAL NO. 7615 OF 2019
CIVIL APPEAL NO. 7975 OF 2019
CIVIL APPEAL NO. 8454 OF 2019
CIVIL APPEAL NO. 8480 OF 2019
CIVIL APPEAL NO. 8482 OF 2019
CIVIL APPEAL NO. 8785-94 OF 2019
CIVIL APPEAL NO. 9139 OF 2019
CIVIL APPEAL NO. 9216 OF 2019
CIVIL APPEAL NO. 9638 OF 2019
CIVIL APPEAL NO. 3064 OF 2020
J U D G M E N T
INDU MALHOTRA, J.
1. The present batch of Appeals has been filed by the AppellantDeveloper, to challenge the judgment passed by the National Consumer
Disputes Redressal Commission (―National Commission‖) directing refund of
the amounts deposited by the Apartment Buyers in the project ―The
Corridors‖ developed in Sector 67-A, Gurgaon, Haryana, on account of the
inordinate delay in completing the construction and obtaining the Occupation
2
Certificate. Aggrieved by the said Judgment, the Appellant-Developer has
filed the present batch of Appeals under Section 23 of the Consumer
Protection Act, 1986 (―Consumer Protection Act‖).
Since common issues have arisen for consideration, they are being
decided by a common Judgment.
For the sake of brevity, the facts in Civil Appeal No. 5785 of 2019 are
being referred to as the lead matter.
2. The Department of Town and Country Planning granted a license to
Respondent No.3 – Precision Realtors Pvt. Ltd. and Respondent No.4 – Blue
Planet Infra Developers and Madeira Conbuild Pvt. Ltd. for developing a
group housing colony on a vast tract of land admeasuring about 37.5125
acres where multiple towers comprising of 1356 apartments were to be
constructed. Subsequently, the license for construction was transferred to the
Appellant - Developer.
3. On 23.07.2013, the Building Plans of the project were sanctioned by
the Directorate of Town and Country Planning, Haryana. Clause 3 of the
sanctioned Plan stipulated that NOC/ Clearance from the Fire Authority shall
be submitted within 90 days from the date of issuance of the sanctioned
Building Plans.
4. The Developer opened booking for the apartments in 2013. On
07.08.2013, the Respondent No.1- Apartment Buyer was allotted a 2 BHK
apartment in Tower-C of the project. Similar allotment letters were issued to
various other Apartment Buyers in the housing project.
3
5. On 23/24.10.2013, the Developer applied for issuance of an NOC for
the Fire Fighting Scheme of the group housing colony to the Commissioner,
Municipal Corporation, Gurgaon.
The Commissioner, Municipal Corporation vide letter dated 30.12.2013
raised 16 objections with respect to the proposed Fire Fighting Scheme
submitted by the Developer.
The Developer replied to the said objections vide letter dated
22.01.2014, stating that the objections raised by the Commissioner had been
rectified. The Developer sought approval of the Fire Fighting Scheme on
priority.
The Municipal Corporation vide letter dated 28.03.2014 informed the
Developer that the deficiencies in the application for Fire NOC had not been
cured. The Developer was granted 15 days‘ time to cure the defects, failing
which, the application would be deemed to be rejected.
Ultimately, on 27.11.2014, the Director, Haryana Fire Service granted
approval to the Fire Fighting Scheme subject to the conditions mentioned
therein.
6. On 12.12.2013, Respondent No.3 obtained environmental clearance
for setting up the group housing project from the State Environment Impact
Assessment Authority. Clause 39 of the said clearance stipulated that the
project proponent shall submit a copy of the Fire Safety Plan duly approved
by the Fire Department before the start of construction.
4
Under Part-B of the General Conditions in Clause (vi), it was stipulated
that the project proponent would obtain all other statutory clearances, such as
the approval for storage of diesel from the Chief Controller of Explosives, Fire
Department, Civil Aviation Department, Forest Conservation Act, 1980 and
Wildlife (Protection) Act, 1972, Forest Act, 1927, PLPA 1900 etc. from the
concerned authorities, prior to the construction of the project.
7. The Apartment Buyers vide letter dated 25.03.2014 received a copy of
the Apartment Buyer‘s Agreement with a construction linked payment plan,
which is extracted hereunder :
INSTALLMENT PAYMENT PLAN
S. No. LINKED STAGES % TOTAL
1 AT THE TIME OF
BOOKING
10% OF BASIC 1727851.60
2 WITHIN 45 DAYS OF
BOOKING
10% OF BASIC 1727851.60
3 COMMENCEMENT OF
EXCAVATION
10% OF BASIC+50%
OF DEVELOPMENT
CHARGES
2029223.85
4 CASTING OF LOWER
BASEMENT ROOF
SLAB
10% OF BASIC+50%
OF DEVELOPMENT
CHARGES
2029223.85
5 CASTING OF 2ND
FLOOR ROOF SLAB
10% OF BASIC 1727851.60
6 CASTING OF 5TH
FLOOR ROOF SLAB
10% OF BASIC 1727851.60
7 CASTING OF 8TH
FLOOR ROOF SLAB
10% OF BASIC+50%
OF CLUB
MEMBERSHIP
1852851.60
8 CASTING OF 11TH
FLOOR ROOF SLAB
10% OF BASIC 1727851.60
9 CASTING OF TOP
FLOOR ROOF SLAB
10% OF BASIC 1727851.60
10 ON COMPLETION OF
STONE/TILE
FLOORING IN
APARTMENT
50% OF BASIC+50%
OF CLUB
MEMBERSHIP
988925.80
11 ON OFFER OF
POSSESSION
50% OF BASIC+100%
OF IFMS+100% OF
IBRF
1139646.80
TOTAL 18406981.50
5
8. On 12.05.2014, the Developer executed the Apartment Buyer‘s
Agreement in favour of Respondent No.1 – Apartment Buyer for a total
consideration of Rs.1,45,22,006/-.
The relevant terms of the Apartment Buyer‘s Agreement are set-out
hereinbelow :
Clause 6 pertains to payment of Earnest Money, and reads as :
―6. EARNEST MONEY
The Company and the Allottee hereby agree that 20% (Twenty percent) of
the Sale Consideration of the Apartment shall be deemed to constitute the
―Earnest Money‖.‖
(emphasis supplied)
Clause 7 pertains to payment of instalments, and provides that :
―7. PAYMENT OF INSTALLMENTS
7.1 The Allottee has opted for the Payment Plan annexed herewith as
Annexure-IV. The Allottee understands that it shall always remain
responsible for making timely payments in accordance with the Payment
Plan Annexure-IV. Only in the case of a construction linked Payment Plan,
the Company shall be obliged to send demand notices for installments on
or about the completion of the respective stages of construction. The
demand notices shall be sent by registered post/courier and shall be
deemed to have been received by the Allottee within 05 (five) days of
dispatch by the Company or receipt thereof, whichever is earlier.
7.2 It shall not be obligatory on the part of the Company to send any
reminders for any payments whatsoever. Although the Company shall not
be obliged to send demand notices other than for the construction linked
Payment Plan, or any reminders whatsoever for payments of the
instalment, in the event that any such notices or reminders are sent by the
Company to the Allottee, as a gesture of courtesy, these shall not, under
any circumstances, be construed or deemed to be a waiver of the
obligations and responsibility of the Allottee to itself make timely payments
in accordance with the Payment Plan or in response to such demand
notices in the case of a construction linked Payment Plan.
7.3 If the Allottee prepays any installments(s) or part thereof to the
Company before it falls due for payment, the Allottee shall be entitled to
pre-payment rebate on such prepaid amounts at the interest rate declared
by the Company for this purpose from time to time. The interest on such
prepaid installment(s) shall be calculated from the date of prepayment uptill
the date when such amount would actually have become due. The credit
due to the Allottee on account of such pre-payment rebate shall however
be adjusted/paid only at the time of final instalment for the said Apartment.
7.4 The Allottee shall be liable to pay simple interest on every delayed
payment, at the rate of 20% per annum from the date that it is due for
payment till the date of actual payment thereof. In case the Allottee defaults
6
in making payment of the due installment (including partial default) beyond
a period of 90 days from the due date, the Company shall be entitled,
though not obliged, to cancel the Allotment and terminate this Agreement at
any time thereafter in accordance herewith. However, the Company may
alternatively, in its sole discretion, instead decide to enforce the payment of
all its dues from the Allottee by seeking Specific Performance of this
Agreement. Further, in every such case of delayed payment, irrespective of
the type of Payment Plan, the subsequent credit of such delayed
installments(s)/payments along with delayed interest in the account of the
Company shall not however constitute waiver of the right of termination
reserved herein and shall always be without prejudice to the rights of the
Company to terminate this Agreement in the manner provided herein.
7.5 Save and except in the case of any bank, financial institution or
company with whom a tripartite agreement has been separately executed
for financing the said Apartment, or where the Company has given its
permission to mortgage to any bank, financial institution or company for
extending a loan to the Allottee against the said Apartment, the Company
shall not be responsible towards any other third party, who has made
payments or remittances to the Company on behalf of the Allottee and any
such third party shall not have any right against the said Apartment or
under this Agreement whatsoever. The Company shall issue the payment
receipts only in favour of the Allottee. Notwithstanding the above, the
Allottee is and shall remain solely and absolutely responsible for ensuring
and making all the payments due under this Agreement on time.
7.6 The Allottee may obtain finance/loan from any financial institution,
bank or any other source, but the Allottee‘s obligation to purchase the said
Apartment pursuant to this Agreement shall not be contingent on the
Allottee‘s ability or competency to obtain such finance. The Allottee would
remain bound under this Agreement whether or not it has been able to
obtain finance for the purchase of the said Apartment. The Allottee agrees
and has fully understood that the Company shall not be under any
obligation whatsoever to make any arrangement for the finance/loan
facilities to the Allottee from any bank/financial institution. The Allottee shall
not omit, ignore, delay, withhold, or fail to make timely payments due to the
Company in accordance with the Payment Plan opted by the Allottee in
terms of this Agreement on the grounds of the non-availability of bank loan
or finance from any bank/financial institution for any reason whatsoever
and if the Allottee fails to make the due payment to the Company within the
time agreed herein, then the Company shall have right to terminate this
Agreement in accordance herewith.
7.7 Furthermore, in every case where the Allottee has obtained a
loan/finance from a bank, financial institution or any other source and for
which a tripartite agreement has also been executed by the Company, it is
agreed by the Allottee that any default by the Allottee of the terms and
conditions of such loan/finance, shall also be deemed to constitute a
default by the Allottee of this Agreement, whereupon or at the written
request of such bank, financial institution or person from whom such loan
has been obtained the Company shall be entitled to terminate this
Agreement.‖
(emphasis supplied)
7
Clause 13 of the Agreement provides for handing over possession of
the Apartments and reads as :
―13. POSSESSION AND HOLDING CHARGES
13.1. Upon receipt of the Occupation Certificate under the Act pertaining
to the said Apartment, the Company shall notify the Allotee in writing to
come and take over the possession of the said Apartment (―Notice of
Possession‖). In the event the Allottee fails to accept and take the
possession of the said Apartment within the time indicated in the said
Notice of Possession, the Allottee shall be deemed to have become the
custodian of the said Apartment from the date indicated in the Notice of
Possession and the said Apartment shall thenceforth remain at the sole risk
and cost of the Allottee itself.
13.2. Notwithstanding any other provisions of this Agreement, the
Allottee agrees that if it fails, ignores or neglects to take the possession of
the said Apartment in accordance with the Notice of Possession sent by the
Company, the Allottee shall be liable to pay additional charges equivalent
to Rs. 7.5 (Rupees Seven & Half only) per sq. ft. on the Super Area per
month of the said Apartment (―Holding Charges‖). The Holding Charges
shall be a distinct charge in addition to the maintenance charges and not
related to any other charges/consideration as provided in this Agreement.
13.3 Subject to Force Majeure, as defined herein and further subject to
the Allottee having complied with all its obligations under the terms and
conditions of this Agreement and not having defaulted under any
provision(s) of this Agreement including but not limited to the timely
payment of all dues and charges including the total Sale Consideration,
registration charges, stamp duty and other charges and also subject to the
Allottee having complied with all formalities or documentation as prescribed
by the Company, the Company proposes to offer the possession of the said
Apartment to the Allottee within a period of 42 (Forty Two) months from the
date of approval of the Building Plans and/or fulfilment of the preconditions
imposed thereunder (―Commitment Period‖). The Allottee further agrees
and understands that the Company shall additionally be entitled to a period
of 180 days (―Grace Period‖), after the expiry of the said Commitment
Period to allow for unforeseen delays beyond the reasonable control of the
Company.
13.4. Subject to Clause 13.3, if the Company fails to offer possession of
the said Apartment to the Allottee by the end of the Grace Period, it shall
be liable to pay to the Allottee compensation calculated at the rate of Rs.
7.5 (Rupees Seven & Half only) per sq. ft. of the Super Area (―Delay
Compensation‖) for every month of delay until the actual date fixed by the
Company for offering possession of the said Apartment to the Allottee. The
Allottee shall be entitled to payment/adjustment against such ‗Delay
Compensation‘ only at the time of ‗Notice of Possession‘ or at the time of
payment of the final installment, whichever is earlier.
13.5. Subject to Clause 13.3, in the event of delay by the Company in
offering the possession of the said Apartment beyond a period of 12
months from the end of the Grace Period (such 12 month period hereinafter
referred to as the ―Extended Delay Period‖), then the Allottee shall become
entitled to opt for termination of the Allotment/Agreement and refund of the
actual paid up installment(s) paid by it against the said Apartment after
adjusting the interest on delayed payments along with Delay Compensation
8
for 12 months. Such refund shall be made by the Company within 90 days
of receipt of intimation to this effect from the Allottee, without any interest
thereon. For the removal of doubt, it is clarified that the Delay
Compensation payable to the Allotee who is validly opting for termination,
shall be limited to and calculated for the fixed period of 12 months only
irrespective of the date on which the Allottee actually exercised the option
for termination. This option may be exercised by the Allottee only up till
dispatch of the Notice of Possession by the Company to the Allottee
whereupon the said option shall be deemed to have irrevocably lapsed. No
other claim, whatsoever, monetary or otherwise shall lie against the
Company and/or the Confirming Parties nor be raised otherwise or in any
other manner by the Allottee.
13.6. If, however, the completion of the said Apartment is delayed due to
Force Majeure as defined herein, the Commitment Period and/or the Grace
Period and/or the Extended Delay Period, as the case may be, shall stand
extended automatically to the extent of the delay caused under the Force
Majeure circumstances. The Allottee shall not be entitled to any
compensation whatsoever, including Delay Compensation for the period of
such delay.
13.7. Under no circumstances shall the possession of the said
Apartment be given to the Allottee and the Allottee shall not be entitled to
the possession of the said Apartment unless and until the full payment of
the Sale Consideration and any other dues payable under the Agreement
have been remitted to the Company and all other obligations imposed
under this Agreement have been fulfilled by the Allottee to the complete
satisfaction of the Company.
13.8. The Allottee hereby agrees and affirms that upon taking
possession of the said Apartment, the Allottee shall be deemed to have
waived all claims against the Company/Confirming Parties, if any, in
respect of the area, specifications, quality, construction and/or any item,
amenity or provision in the said Apartment or The Corridors Project.‖
(emphasis supplied)
Clause 21.3 reads as under:
―21. TIME IS OF ESSENCE; TERMINATION AND FORFEITURE OF
EARNEST MONEY
21.1 Notwithstanding anything contained in this Agreement, timely
performance by the Allottee of all its obligations under this Agreement or
exercise of any options wherever and wherever and whenever indicated
herein this Agreement including without limitation its obligations to make
timely payments of the Sale Consideration, maintenance charges and other
deposits and amounts, including any interest, in accordance with this
Agreement shall be of essence under this Agreement. If the Allottee
neglects, omits, ignores, or fails in the timely performance of its obligations
agreed or stipulated herein for any reason whatsoever or acts in any
manner contrary to any undertaking assured herein or fails to exercise the
options offered by the Company within the stipulated period or to pay in
time to the Company any of the instalments or other amounts and charges
due and payable by the Allottee as described in Clause 7.7 herein, the
Company shall be entitled to cancel the allotment and terminate this
Agreement in the manner described hereunder.
9
21.1.1 In case any failure or breach committed by the Allotee is incapable
or rectification or is in the opinion of the Company unlikely to be rectified by
the Allottee or where the Allottee is a repetitive defaulter or such failure or
default is continuing despite the Allottee being given an opportunity to
rectify the same, then this Agreement may be cancelled by the Company
with immediate effect at its sole option by written notice (―Notice of
Termination‖) to the Allottee intimating to the Allottee the decision of the
Company to terminate the Agreement and the grounds on which such
action has been taken.
…..
21.3 The Allottee understands, agrees and consents that upon such
termination, the Company shall be under no obligation save and except to
refund the amounts already paid by the Allottee to the Company, without
any interest, and after forfeiting and deducting the Earnest Money, interest
on delayed payments, brokerage/commission/charges, service tax and
other amounts due and payable to it, only after resale of the said
Apartment. Upon termination of this Agreement by the Company, save for
the right to refund, if any to the extent agreed hereinabove, the Allottee
shall have no further right or claim against the Company and/or the
Confirming Parties which, if any, shall be deemed to have been waived off
by the Allottee and the Allottee hereby expressly consents thereto. The
Company shall thenceforth be free to deal with the said Apartment in any
manner whatsoever, in its sole and absolute discretion and in the event that
the Allottee has taken possession of the said Apartment and everything
whatsoever contained therein and in such event, the Allottee and/or any
other person/occupant of the said Apartment shall immediately vacate the
said Apartment and otherwise be liable to immediate ejectment as an
unlawful occupant/trespasser. This is without prejudice to any other rights
available to the Company against the Allottee.‖
(emphasis supplied)
9. On 27.12.2017, Respondent No.1 filed a Consumer Complaint being
Consumer Case No.3823 of 2017 before the National Commission, wherein it
was inter alia prayed that the Developer be directed to refund the amount of
Rs.1,44,72,364/- paid by the Apartment Buyer alongwith interest @ 20% per
annum compounded quarterly till realization, and compensation towards
damages on account of harassment, mental agony and litigation charges.
The Apartment Buyer inter alia submitted that the Developer had invited
applications from the public for booking flats in the housing complex ―The
Corridors‖, by misrepresenting that all necessary approvals/pre-clearances
10
with respect to the and constructions had already been obtained from the
office of the Director, Town and Country Planning, Haryana, and other civil
authorities. The Developer had misrepresented at the time of booking that the
project would have a 90-meters motorable access road approaching the
project from Junction 63A to 67A which was shown in the Apartment Buyer‘s
Agreement in the layout plan. However, there was no access road of 90-
meters to the project, and/or 24-meters in the revised plans. The Apartment
Buyers were induced to book apartments on false representations made by
the Developer that construction of the project would be completed the project
within 42 months from the collection of the initial booking amount.
As per Clause 13.3 of the Agreement, possession was to be handed
over within a period of 42 months from the date of approval of the Building
Plans, with a Grace Period of 180 days. Despite the aforesaid terms, the
Developer had not offered possession to the Apartment Buyers till the date of
filing the complaint, even though the ―Commitment Period‖ for handing over
possession had expired on 22.01.2017, and also the Grace Period had lapsed
on 22.07.2017. The Apartment Buyers had regularly paid instalments as per
the demands raised by the Developer. As on December 2016, a total sum of
Rs.1,44,72,364/- had been paid by the Respondent No. 1 to the Developer.
To date, no offer of possession has been made to Apartment Buyers.
The Apartment Buyers submitted that the Building Plans were revised in
2017, when the entire layout was changed which led to the scrapping of some
of the residential towers, so that the same could be converted to commercial
towers in the project. It was further mentioned that the office of the District
11
Town Planner (Enforcement), Gurgaon, Haryana, vide a restraint order dated
20.02.2017 issued Memo No.525-526 to the Developer to immediately stop
the construction with respect to Tower-A and Tower-B for causing harassment
to the buyers.
10. The Developer filed its reply to the Consumer Complaint submitting that
there was no delay in offering possession of the flats, since as per Clause
13.3 of the Agreement, possession was to be handed over to the allottees
within 42 months from the date of approval of the Building Plans, which
included fulfilment of the conditions imposed thereunder. The Building Plan
approval had been granted on 23.07.2013, which stipulated compliance with
several pre-conditions, including obtaining Fire Safety Scheme approval. This
approval was granted only on 27.11.2014. Consequently, the 48 months‘ time
period for delivery of possession of the apartment would commence only on
27.11.2014, and expire on 27.11.2018. Consequently, there was no delay in
offering possession of the apartments. Hence, the complaint was premature
and liable to be dismissed.
11. The National Commission in another case titled as “IREO Grace
Realtech Pvt. Ltd. v. Ritu Hasija” being CC No.190 of 2017 and connected
matters, decided on 18.09.2018, held that clause 44 of that Agreement was
wholly unfair and one-sided, which gave only a limited right to the Apartment
Buyers to terminate the agreement, and seek refund of the amount paid by
them. Clause 21.3 of the Flat Buyers Agreement read in conjunction with the
other Clauses of the Agreement would result in a situation where a flat buyer,
despite the failure of the builder to offer possession within the time stipulated,
12
would be practically left remediless for 1½ years from the date of default, with
no interest or compensation payable to him, even though the money was
utilized by the builder. Even the principal amount would be refunded at an
uncertain future point, after the builder had sold the apartment allotted to the
complainant. Such a term was wholly unfair and unjust since the Developer
had the right to terminate the agreement even if a single default occurred on
the part of the Buyers, and forfeit the earnest money, and deduct other
charges specified in Clause 21.3 of the Buyers Agreement. Clause 44
postponed the right of the flat buyer to terminate the agreement and seek
compensation even after the Grace Period had expired, which was wholly
unfair and one-sided. The contract could be terminated after a delay of 12
months, and would be entitled to only delay compensation, without interest.
The Commission held that since the Developer had failed to deliver
possession of the allotted flats to the Apartment Buyers, it amounted to
deficiency in service, and the complainants were entitled to refund of the
amount alongwith appropriate compensation.
The Developer has filed SLP (C) No.40286 of 2019 against this
judgment, which has been tagged to the present batch of appeals.
12. This judgment was followed by the National Commission in the case of
Subodh Pawar v. IREO Grace Realtech Pvt. Ltd. & Others, decided on
24.09.2018. The SLP filed by the Developer against this judgment, was
dismissed by the Supreme Court vide order dated 28.01.2019, on the
statement made by the Counsel for the Developer that the amount due and
13
payable as per the order of the National Commission, shall be refunded within
a period of four weeks with interest @ 10% p.a. w.e.f. 27.05.2018 till the date
of payment.
A similar order was passed by this Court in IREO v. Surendra Arora
Civil Appeal (Diary) No. 48101 of 2018 on 28.01.2019.
13. With respect to the same project, an Apartment Buyer filed a complaint
under Section 31 of the Real Estate (Regulation & Development) Act, 2016
(―RERA Act‖) read with Rule 28 of the Haryana Real Estate (Regulation &
Development) Rules, 2017 before the Haryana Real Estate Regulatory
Authority, Gurugram (―RERA‖). In this case, the Authority vide order dated
12.03.2019 held that since the environment clearance for the project
contained a pre-condition for obtaining Fire Safety Plan duly approved by the
Fire Department before starting construction, the due date for possession
would be required to be computed from the date of Fire Approval granted on
27.11.2014, which would come to 27.11.2018. Since the Developer had failed
to fulfil the obligation under Section 11(4)(a) of this Act, the Developer was
liable under the proviso to Section 18 to pay interest at the prescribed rate of
10.75% p.a. on the amount deposited by the complainant, upto the date when
the possession was offered. However, keeping in view the status of the
project, and the interest of other allottees, the Authority was of the view that
refund cannot be allowed at this stage. The Developer was directed to
handover possession of the apartment by 30.06.2020, as per the Registration
Certificate for the project.
14
14. The present batch of consumer complaints was decided by the
National Commission vide judgment and order dated 28.03.2019, which has
been impugned herein. The National Commission has allowed the consumer
complaints in terms of the earlier order passed in the Subodh Pawar case
(supra). The National Commission recorded the statement of the counsel for
the complainants that in order to avoid any further litigation, the complainants
were restricting their claim for refund of the principal amount paid to the
Developer, alongwith compensation @ 10% S.I. p.a. w.e.f. from 10.07.2017,
which was awarded by this Court to another allottee in the same project as
per Consent Order dated 28.01.2019 passed in Civil Appeal Diary No.48101
of 2018.
15. We have heard the learned Counsel for the parties. The issues which
have arisen for consideration are :
(i) Determination of the date from which the 42 months period for handing
over possession is to be calculated under Clause 13.3, whether it
would be from the date of issuance of the Fire NOC as contended by
the Developer; or, from the date of sanction of the Building Plans, as
contended by the Apartment Buyers;
(ii) Whether the terms of the Apartment Buyer‘s Agreement were onesided, and the Apartment Buyers would not be bound by the same;
(iii) Whether the provisions of the Real Estate (Regulation and
Development) Act, 2016 must be given primacy over the Consumer
Protection Act, 1986;
15
(iv) Whether on account of the inordinate delay in handing over
possession, the Apartment Buyers were entitled to terminate the
agreement, and claim refund of the amounts deposited with interest.
16. The counsel for the Appellant – Developer inter alia submitted that :
(a) On the first issue, it was submitted that the period of 42 months
for handing over possession would commence only after the
conditions mentioned in the Building Plans were fulfilled. The
Apartment Buyer‘s Agreement in Clause 13.3 provides that the 42
months period would commence from ―the date of approval of the
Buildings plans and/or fulfilment of the pre-conditions imposed
thereunder‖.
Clause 17(iv) of the Building Plans duly sanctioned on
23.07.2013 issued by the Directorate of Town and Country Planning,
stipulated that:-
―17(iv). That the Coloniser shall obtain the clearance/NOC as per
the provisions of the Notification No.SO 1533(E) dated 14.09.2006
issued by the Ministry of Environment & Forests, Government of
India before starting the construction/execution of development
works at site.‖
(emphasis supplied)
This stipulation has been affirmed by the RERA, a specialised
fact-finding authority in respect of real estate projects, while interpreting
the starting point of the 42 months period from the date of fire safety
approval. Since the fire safety approval was obtained on 27.11.2014,
the period of 42 months would commence from this date.
16
The due date for handing over possession of apartments must
be taken to be 27.11.2018 i.e. 42 months from the date of obtaining the
Fire Safety NOC on 27.11.2014, and a Grace Period of 6 months. In
this view of the matter, the complaint filed before the National
Commission was premature and liable to rejected.
(b) The Apartment Buyers were bound by the terms of the
Apartment Buyer‘s Agreement, which clearly states that the
―Commitment Period‖ would start only after fulfilment of the preconditions under the Building Plan, and must be given effect to by any
adjudicatory body.
(c) Under Sections 15(2) and (3) of the Haryana Fire Service Act,
2009, it is the duty of the Authority to grant a provisional NOC within a
period of 60 days from the date of submission of the application. The
delay/failure of the Authority to grant a provisional NOC cannot be
attributed to the Developer.
(d) The Apartment Buyers was not required to pay the entire
consideration amount at the commencement of the agreement, in a
lump sum amount, since the consideration was linked to the
construction plan, and was payable in instalments at various stages of
the construction.
The Developer had not taken any instalment prior to 27.11.2014,
when the Fire Safety NOC was granted. The first instalment was taken
on 27.01.2015, when a demand for casting the lower roof slab was
17
made from the allottees. All substantial payments of the project were
based on milestones linked to construction.
(e) It was submitted that in large development projects, where
multiple towers are being constructed, delays are inevitable. The
Agreement contemplated a reasonable Grace Period of 180 days,
which is a standard clause in the construction industry. The Apartment
Buyer is not entitled to seek refund unless the Extended Delay Period is
over. In any event, the Apartment Buyer is being paid Delay
Compensation for the period of delay which has occurred during the
course of construction.
(f) The finding recorded by the National Commission that the
clauses of the Apartment Buyer‘s Agreement were one-sided and unfair
was illegal and without jurisdiction, under the Consumer Protection Act,
1986. It was only under the Consumer Protection Act, 2019, which
came into effect from 20.07.2020, that the State Consumer Forum and
the National Commission were conferred with the power to declare
contractual terms that were as unfair to consumers as null and void.
Such power did not exist under the 1986 Act.
(g) It was further submitted that the National Commission was not
justified in passing the impugned order by directing a full refund of the
principal amount with interest @ 10% S.I. p.a. as compensation from
10.07.2017 till the refund was made within four weeks, failing which,
18
interest would be payable from the date of each deposit to the
Developer, till the entire amount was refunded.
(h) It was submitted that the Respondents in Civil Appeals No.7615,
7975, 8454, 8480, 8482, 8785-8794, 9139, 9216 and 9638 of 2019; and
the Appellant in Civil Appeal No.3064 of 2020, are defaulters since they
had paid only between 30 to 40% of the total consideration. These
buyers had breached their obligation to make payments as per the
construction linked payment plan. Despite this, the Developer had
made an alternate offer of similar units in the completed towers in
Phase 1 of the project where the Occupation Certificate had been
granted, before the expiry of the Extended Delay Period.
(i) It was contended that the decision of the RERA must be given
primacy over the National Commission. The impugned judgment
passed by the National Commission was in direct conflict with the
judgment passed by the RERA, Haryana since the National
Commission had assumed the due date for offer of possession as
23.01.2017. The RERA had correctly held that the due date for delivery
of possession of apartments under the Agreement was 27.11.2018.
RERA had directed the Developer to hand over possession by
30.06.2020, as mentioned in the Registration Certificate filed before the
RERA. In view of the conflicting views taken by the two Fora which
exercise original jurisdiction, it is the order of RERA which ought to be
upheld. Particularly, since RERA is a specialized fact-finding authority
with respect to real estate projects, it is the special law which must
19
prevail over the general law. RERA has been established under the
Real Estate (Regulation & Development) Act, 2016 (―RERA Act‖), for
regulation and promotion of the real estate sector.
(j) It was submitted that by 21.07.2017, the construction of Phase I
of the project had been completed, which comprised of Towers A6 –
A10, B1 – B4, and C3 – C7, for which the Occupation Certificate was
issued on 31.05.2019, and an offer of possession was made to the
apartment buyers.
With respect to the remaining Towers in Cluster-A comprising of
buildings A1 to A5; Cluster-B comprising of buildings B5 to B8; and,
Cluster-C comprising of buildings C8 to C11, the application for grant of
part Occupation Certificate was submitted on 10.09.2019, which is
pending approval.
The Developer made an alternate offer to the apartment buyers
whose allotments were in Phase-II of the project, where the Occupancy
Certificate has yet to be obtained, to transfer their allotment to a ready
to move-in apartment in Phase-I of the project, where the Occupation
Certificate had been issued.
The construction and development of ―The Corridors‖ group
housing project has now been completed, with Occupation Certificate
having been issued with respect to 700 apartments, out of a total of
1356 apartments in Towers A6 to A10, B1 to B4, and C3 to C7.
20
(k) The Consent Order passed in IREO Grace Realtech Pvt. Ltd. v.
Surendra Arora could not be relied upon to grant relief in this batch of
cases, since it was a Consent Order passed by the Court, and could
not be treated as a precedent.
17. In response, the Apartment Buyers have inter alia submitted as under :-
(a) The building plans were approved on 23.07.2013, and the
Developer was required to hand over possession of the apartments
within a period of 42 months from the date of approval, which expired
on 22.01.2017. If the Grace Period of 6 months under Clause 13.3 was
added, the Developer was required to give possession by 22.07.2017.
The Developer received the Occupation Certificate for certain Towers
of the Project on 31.05.2019. Possession was offered to the Apartment
Buyers in Phase I of the project in 2019, after a delay of 1 ½ years.
Assuming that the date for possession would begin from the date
of issuance of the Fire NOC i.e. 27.11.2014, the Developer was
required to offer possession by 27.11.2018. The Developer offered
possession in Phase I of the Project to certain Apartment Buyers only
after it received the Occupation Certificate in 2019.
With respect to the majority of the apartment buyers before this
Court, their allotments were in Towers which were in Phase II of the
project, where O.C. is yet to be obtained even as on date.
Consequently, there has been a delay of over 3 ½ years.
21
(b) The grant of Fire NOC was not a pre-condition for
commencement of construction work. In fact, the Developer had started
the construction before the grant of Fire NOC. Therefore, it could not
be contended that the delay in issuance of the Fire Safety clearance
had impeded the construction of the units allotted to the respondents.
(c) The Developer had sought payment of the first three instalments
prior to receiving the Fire NOC. The third instalment was paid on
18.03.2014, before the grant of Fire NOC.
(d) It was further submitted that neither the Building Plan Approval
nor Section 15 of the Haryana Safety Act, 2009 places any restriction
on the commencement of construction, which would be evident from
the fact that the Developer had started the construction before the
grant of the Fire NOC.
(e) The sanctioned Building Plans stipulated that the NOC for Fire
Safety (Provisional) was required to be obtained within a period of 90
days from the date of approval of the Building Plans, which expired on
21.10.2013. The Developer applied for the Provisional Fire Approval on
24.10.2013 after the expiry of the mandatory 90 days‘ period got over.
The application filed was deficient and casual and did not provide the
requisite details. The appellant submitted the corrected sets of
drawings as per the NBC-2005 Fire Scheme only on 13.10.2014, which
reflected the laxity of the Developer in obtaining the Fire NOC.
22
The approval of the Fire Safety Scheme took more than 16
months from the date of the Building Plan approval i.e. from 23.07.2013
to 27.11.2014. The Builder failed to give any explanation for the
inordinate delay in obtaining the Fire NOC.
(f) The Respondents placed reliance on the order passed in the
case of IREO Victory Valley Pvt. Ltd. v. Shamshul Hoda Khan,
1
wherein the National Commission held that the Fire NOC was not a
pre-condition for commencement of the construction work. The Appeal
of the Developer was rejected by this Court vide order dated
03.05.2019, and the Review Petition was dismissed on 15.10.2019.
(g) The Agreement contained one-sided clauses, which were not
final and binding on the apartment buyers, and would constitute an
unfair trade practice. Reliance was placed on the judgment of this
Court in Pioneer Urban Land and Infrastructure Ltd v. Govindan
Raghavan.
2
(h) The respondents submitted that they had availed of loans to pay
the instalments, on which interest @ 7.90% was being paid. On
account of the inordinate delay which had occurred, they were unable
to pay further instalments, and insisted on refund of the amounts paid.
1 Civil Appeal No.4801 of 2019 decided on 03.05.2019.
2
(2019) 5 SCC 725.
23
DISCUSSION & ANALYSIS
18. Determination of the date for handing over Possession
The first issue which has been raised by the Appellant - Developer as
also the Apartment Buyers, is the relevant date from which the 42 months‘
period is to be calculated for handing over possession. Clause 13.3 of the
Agreement states that the Developer proposed to offer possession of the
apartment to the allottee within a period of 42 months from the date of
approval of the Building Plans and/or fulfilment of the pre-conditions imposed
thereunder, referred to as the ―Commitment Period‖. The Company would be
entitled to a further ―Grace Period‖ of 180 days‘ after the expiry of the
Commitment Period for unforeseen delays beyond the reasonable control of
the Company. This would work out to 42 + 6 months i.e. 48 months.
18.1 The point of controversy is whether the 42 months‘ period is to be
calculated from the date when the Fire NOC was granted by the concerned
authority, as contended by the Developer; or, the date on which the Building
Plans were approved, as contended by the Apartment Buyers.
18.2 Section 15 of the Haryana Fire Safety Act, 2009 makes it mandatory for
a Builder/Developer to obtain the approval of the Fire Fighting Scheme
conforming to the National Building Code of India, and obtain a No Objection
Certificate before the commencement of construction. Section 15 is extracted
hereinbelow for ready reference:
―15. Approval of Fire Fighting Scheme and issue of no objection
certificate.—(1) Any person proposing to construct a building to be used
for any purpose other than residential purpose or a building proposed to be
used for residential purpose of more than 15 meters in height, such as
group housing, multi-storeyed flats, walk-up apartments, etc. before the
24
commencement of the construction, shall apply for the approval of
Fire Fighting Scheme conforming to National Building Code of India,
the Disaster Management Act, 2005 (53 of 2005), the Factories Act, 1948
(Act 63 of 1948) and the Punjab Factory Rules, 1952, and issue of no
objection certificate on such form, alongwith such field as may be
prescribed.
(2) The Director or any officer duly authorised by him in this behalf,
may take cognizance of any application and issue such instructions and
orders regarding the building plan and for construction by issuing a
provisional no objection certificate before the construction is taken up.
Explanation. –In case any person proposes to increase the number of
floors on any building already constructed in such a manner that it shall
qualify for being termed as a high rise building, shall before construction,
apply for no objection certificate.
(3) The provisional no objection certificate shall be issued within 60
days of submission of application along with such fee, as may be
prescribed, giving all the details of the construction being undertaken as
well as the rescue, fire prevention and fire safety details required to be
incorporated during the period of construction.
(4) During the process of construction, the inspection of the
construction may be conducted and the advice about any additions,
deviations, modifications that are required to be carried out from the
precaution and prevention point of view, may be tendered. Such advice
shall be made on a prescribed proforma and handed over to the party
concerned.
(5) On completion of the construction of the high-rise building, a no
objection certificate shall be obtained. In the absence of such certificate,
the owner shall not occupy, lease or sell the building.‖
(emphasis supplied)
18.3 Clause 13.3 of the Apartment Buyer‘s Agreement provides that the 42
months‘ period has to be calculated from the date of approval of the Building
Plans and/or fulfilment of the pre-conditions imposed thereunder.
18.4 The Building Plans sanctioned by the Directorate of Town and Country
Planning, Haryana contained the Terms & Conditions of Approval, which
included a provision for Fire Safety contained in Clause (3). The Developer
was directed to submit Fire Safety Plans indicating the complete Fire
Protection Arrangements, and means of escape/access for the proposed
building with suitable legend and standard signs.
25
Clause 3 of the Building Plans contained a provision for Fire Safety,
which reads :
―3. FIRE SAFETY
On receipt of the above request the Commissioner, Municipal Corporation,
Gurgaon after satisfying himself that the entire fire protection measures
proposed for the above buildings are as per NBC and other Fire Safety Bye
Laws, and would issue a NOC from Fire safety and means of
escape/access point of view. This clearance/NOC from Fire Authority shall
be submitted in this office along with a set of plans duty signed by the
Commissioner, Municipal Corporation, Gurgaon within a period of 90 days
from the date of issuance of sanction of building plans. Further, it is also
made clear that no permission for occupancy of the building shall be issued
by Commissioner, Municipal Corporation, Gurgaon unless he is satisfied
that adequate fire fighting measures have been installed by you and
suitable external fire fighting infrastructure has been created at Gurgaon,
by Municipal Corporation, Gurgaon. A clearance to this effect shall be
obtained from the Commissioner, Municipal Corporation, Gurgaon before
grant of occupation certificate by the Director General.‖
18.5 On receipt of the Fire Plans, the Commissioner, Municipal Corporation,
Gurgaon, after satisfying himself with the entire fire protection measures as in
conformity with the National Building Code, 2005 (―NBC‖) and the Fire Safety
Bye-Laws, would issue an NOC for Fire Safety. This NOC/Clearance was
required to be submitted before the Municipal Corporation, within a period of
90 days‘ from the issuance of the sanctioned Building Plans.
18.6 Clause 17(iv) of the sanctioned Plan stipulated that the Developer shall
obtain an NOC from the Ministry of Environment & Forests, before starting the
construction/execution of development works at site.
―17 (iv) That the Developer shall obtain the clearance/NOC as per the
provisions of the Notification No. S.O. 1533(E) dated 14.09.2006 issued by
Ministry of Environment and Forest, Government of India before starting
the construction/execution of development works at site.‖
(emphasis supplied)
18.7 The Environmental Clearance granted by the Ministry of Environment &
Forest Government of Haryana on 12.12.2013 required the Developer to
26
submit a copy of the Fire Safety Plan approved by the Fire Department,
before commencing construction of the project.
General Condition (vi) under Part B of the Environmental Clearance
stipulated that the Developer shall obtain all other statutory clearances,
including the approval from the Fire Department, prior to construction of the
project.
Clause (vi) provides that :
“(vi) All other statutory clearance such as the approvals for storage of
diesel from Chief Controller of Explosive, Fire Department, Civil Aviation
Department, Forest Conservation Act, 1980 and Wildlife (Protection) Act,
1972, Forest Act, 1927, PLPA 1900 etc. shall be obtained as applicable by
project proponents from the respective authorities prior to construction of
the project.‖
(emphasis supplied)
18.8 We are of the view that it was a mandatory requirement under the
Haryana Fire Safety Act, 2009 to obtain the Fire NOC before commencement
of construction activity. This requirement is stipulated in the sanctioned
Building Plans, as also in the Environment Clearance.
18.9 The 42 months‘ period in Clause 13.3. of the Agreement for handing
over possession of the apartments would be required to be computed from
the date on which Fire NOC was issued, and not from the date of the Building
Plans being sanctioned.
18.10 In the present case, the Developer obtained approval of the Building
Plans from the Directorate, Town and Country Planning, Haryana, on
23.07.2013. The Developer applied for issuance of Fire NOC for the Fire
Fighting Scheme of the Group Housing Colony within the 90 days period
before the Director, Fire Service, Panchkula.
27
The Commissioner vide letter dated 30.12.2013 raised 16 objections
with respect to the proposed Fire Fighting Plan.
The Developer vide letter dated 22.01.2014 responded to the
objections, submitting that the objections had been cured, and requested that
the approval of the Fire Fighting Scheme be granted on a priority basis.
The Fire Department informed the Developer vide letter dated
28.03.2014 that the deficiencies in the application for Fire NOC had not been
cured. The Developer was granted a further period of 15 days‘ to cure the
defects, failing which, its application would be deemed to be rejected.
The Developer submitted revised drawings as per the NBC Fire
Scheme alongwith its letter dated 18.08.2014. This letter was received in the
office of the Municipal Corporation on 13.10.2014, as per endorsement on the
said letter.
18.11 On 27.11.2014, the Director, Haryana Fire Service granted approval to
the Fire Fighting Scheme subject to the conditions mentioned therein. The
computation of the period for handing over possession would be computed
from this date. The Commitment Period of 42 months plus the Grace Period
of 6 months from 27.11.2014, would be 27.11.2018, as being the relevant
date for offer of possession.
The aforesaid chronology for obtaining Fire NOC would indicate a
delay of approximately 7 months in obtaining the Fire NOC by the Developer.
28
19. Whether the terms of the Apartment Buyer’s Agreement are one-sided?
The second issue which has been raised by the Apartment Buyers is
that the Agreement in this case, contains wholly one-sided clauses, and
would not be bound by its terms.
19.1 We have carefully perused the terms of the Agreement, and an
analysis of the same reveals that :
a) Under the construction-linked plan, Clause 6 provided that the
apartment buyers would be required to deposit 20% of the sale
consideration within 45 days of booking of the apartment.
b) Clause 7.4 of the Agreement provides that if there is a delay in
payment of an instalment, the apartment buyer would be required to
pay Interest on every delayed payment of such instalment @ 20% S.I.
p.a.
c) Clause 13.2 of the Agreement provides that if the allottee fails,
ignores or neglects to take possession of the said Apartment in
accordance with the Notice of Possession, the allottee shall be liable to
pay ―Holding Charges‖ on the super area @ Rs.7.5 per sq. ft. per
month.
d) In contrast, Clause 13.3 of the Agreement provides that if the
Company fails to offer possession by the end of the Grace Period i.e.
42+6 months, it would be liable to pay Delay Compensation @ Rs.7.5
per sq. ft. of the super area for every month of delay.
29
Delay compensation at Rs. 7.5 per sq. ft. works out to
approximately 0.9% to 1 % Interest per annum. The price per sq. ft of
an apartment under the Apartment Buyer‘s Agreement was Rs.
10,350/- per sq. ft. The compensation payable for delay was Rs. 7.5
per sq. ft. The compensation payable by the Developer for delay in
offering possession works out to :
7.5____ x 100 x 12 = 0.9 % to 1% p.a.
10,350
e) Clause 13.5 provides that the allottee may opt for termination,
only after 42 months from the date of issuance of Fire NOC + 6 months‘
Grace Period, plus a further period of 12 months.
The Delay Compensation would be payable to the allottee only if
the termination was ―validly opted‖. The compensation was limited to a
fixed period of 12 months only, and that no other claim whatsoever,
whether monetary or otherwise, was payable by the Developer.
f) Clause 13.8 of the Agreement provides that the allottee shall be
deemed to have waived all its claims in respect of the area,
specifications, quality, construction, any other provision in the
apartment against the Developer upon taking possession of the
apartment.
g) Clause 21 provides for termination of the Agreement and
forfeiture of earnest money by the Developer, if the allottee neglects or
fails to make timely payments as stipulated in the Agreement, or fails to
exercise the options offered by the Developer.
30
Clause 21.3 provides that upon such termination, the Appellant
Company shall be under no obligation, except to refund the amounts
already paid by the allottee, without any interest, and after forfeiting
and deducting the earnest money, interest on delayed payments,
brokerage / commission / charges, service tax and other amounts due
and payable to it. The principal amount after the aforesaid deductions
are made, would be refunded at an uncertain future date i.e. after the
Developer had sold the apartment allotted to the complainant.
In contrast, the allottee is given a very limited right to cancel the
Agreement solely in the event of the clear and unambiguous failure of
the warranties of the Company, which leads to frustration of the
Agreement on that account. In such case, the allottee will be entitled to
a refund of the instalments actually paid, along with interest @ 8% p.a.
within a period of 90 days from the date of determination to this effect.
No other claim, whatsoever, monetary or otherwise shall lie against the
Company.
19.2 The aforesaid clauses reflect the wholly one-sided terms of the
Apartment Buyer‘s Agreement, which are entirely loaded in favour of the
Developer, and against the allottee at every step.
The terms of the Apartment Buyer‘s Agreement are oppressive and
wholly one-sided, and would constitute an unfair trade practice under the
Consumer Protection Act, 1986.
31
19.3 Section 2(1)(c) of the Consumer Protection Act, 1986 defines a
‗complaint‘ as :
―2.(1)(c) ―complaint‖ means any allegation in writing made by a
complainant that –
(i) any unfair trade practice or a restrictive trade practice has been
adopted by any trader or service provider;
(ii) the goods bought by him or agreed to be bought by him suffer from one
or more defects.
…. ‖
(emphasis supplied)
Section 2(1)(g) of the Act defines the expression ―deficiency‖ to include
any fault, shortcoming or inadequacy in the quality, nature and manner of
performance which is required to be maintained under law, or in pursuance of
a contract, or in relation to a ‗service‘.
The term ―service‖ has been defined by S. 2(1)(o) to include a service
of any description which is made available to potential users.
S. 2(1)(o) was amended by Act 50 of 1993 w.e.f. from 18.06.1993 to
include ―housing construction‖ within the purview of ―service‖. The amended
Section 2(1)(o) reads as follows :-
―2(1)(o) "service" means service of any description which is made available to
potential users and includes, but not limited to, the provision of facilities in
connection with banking, financing insurance, transport, processing, supply of
electrical or other energy, board or lodging or both, housing construction,
entertainment, amusement or the purveying of news or other information, but
does not include the rendering of any service free of charge or under a contract
of personal service;‖
(emphasis supplied)
In Lucknow Development Authority v. M.K. Gupta,
3
this Court
discussed the legislative intent of including ―housing construction‖ within the
ambit of ‗service‘ as :
3
(1994) 1 SCC 243.
32
―2. …. A scrutiny of various definitions such as ‗consumer‘, ‗service‘,
‗trader‘, ‗unfair trade practice‘ indicates that legislature has attempted to
widen the reach of the Act. Each of these definitions are in two parts, one,
explanatory and the other explanatory. The explanatory or the main part
itself uses expressions of wide amplitude indicating clearly its wide sweep,
then its ambit is widened to such things which otherwise would have been
beyond its natural import. Manner of construing an inclusive clause and its
widening effect has been explained in Dilworth v. Commissioner of Stamps
[1899 AC 99 : 15 TLR 61] as under:
―‗include‘ is very generally used in interpretation clauses in order to
enlarge the meaning of the words or phrases occurring in the body
of the statute, and when it is so used these words or phrases must
be construed as comprehending, not only such things as they
signify according to their natural, import, but also those things which
the definition clause declares that they shall include.‖
It has been approved by this Court in Regional Director, Employees' State
Insurance Corpn. v. High Land Coffee Works of P.F.X. Saldanha and Sons
[(1991) 3 SCC 617] ; CIT v. Taj Mahal Hotel, Secunderabad [(1971) 3 SCC
550] and State of Bombay v. Hospital Mazdoor Sabha [AIR 1960 SC 610 :
(1960) 2 SCR 866 : (1960) 1 LLJ 251] . The provisions of the Act thus have
to be construed in favour of the consumer to achieve the purpose of
enactment as it is a social benefit oriented legislation. The primary duty of
the court while construing the provisions of such an Act is to adopt a
constructive approach subject to that it should not do violence to the
language of the provisions and is not contrary to the attempted objective of
the enactment.
6….. As pointed out earlier the entire purpose of widening the definition is to
include in it not only day to day buying and selling activity undertaken by a
common man but even such activities which are otherwise not commercial
in nature yet they partake of a character in which some benefit is conferred
on the consumer. Construction of a house or flat is for the benefit of person
for whom it is constructed. He may do it himself or hire services of a builder
or contractor. The latter being for consideration is service as defined in the
Act. Similarly when a statutory authority develops land or allots a site or
constructs a house for the benefit of common man it is as much service as
by a builder or contractor. The one is contractual service and other statutory
service. If the service is defective or it is not what was represented then it
would be unfair trade practice as defined in the Act. Any defect in
construction activity would be denial of comfort and service to a consumer.
When possession of property is not delivered within stipulated period the
delay so caused is denial of service. Such disputes or claims are not in
respect of immoveable property as argued but deficiency in rendering of
service of particular standard, quality or grade. Such deficiencies or
omissions are defined in sub-clause (ii) of clause (r) of Section 2 as unfair
trade practice.
….
A person who applies for allotment of a building site or for a flat constructed
by the development authority or enters into an agreement with a builder or a
contractor is a potential user and nature of transaction is covered in the
expression 'service of any description'. It further indicates that the definition
is not exhaustive. The inclusive clause succeeded in widening its scope but
33
not exhausting the services which could be covered in earlier part. So any
service except when it is free of charge or under a constraint of personal
service is included in it. Since housing activity is a service it was covered in
the clause as it stood before 1993.‖
19.4 Clause 2(1)(r) of the Consumer Protection Act, 1986 defines ―unfair
trade practice‖ as follows :-
―2(1)(r) ―unfair trade practice‖ means a trade practice which, for the purpose
of promoting the sale, use or supply of any goods or for the provision of any
service, adopts any unfair method or unfair or deceptive practice including
any of the following practices, namely:-
… …. … ‖
(emphasis supplied)
The said definition is an inclusive one, as held by this Court in Pioneer
Urban Land & Infrastructure Ltd. v. Govindan Raghavan,
4 wherein this Court
speaking through one of us (J. Indu Malhotra) held :-
―6.1 …. The inordinate delay in handing over possession of the flat clearly
amounts to deficiency of service. In Fortune Infrastructure v. Trevor D'Lima
[Fortune Infrastructure v. Trevor D'Lima, (2018) 5 SCC 442 : (2018) 3 SCC
(Civ) 1] , this Court held that a person cannot be made to wait indefinitely
for possession of the flat allotted to him, and is entitled to seek refund of the
amount paid by him, along with compensation.
6.2. The respondent flat purchaser has made out a clear case of deficiency
of service on the part of the appellant builder. The respondent flat purchaser
was justified in terminating the apartment buyer's agreement by filing the
consumer complaint, and cannot be compelled to accept the possession
whenever it is offered by the builder. The respondent purchaser was legally
entitled to seek refund of the money deposited by him along with
appropriate compensation.
6.3 The National Commission in the impugned order dated 23-10-2018
[Geetu Gidwani Verma v. Pioneer Urban Land and Infrastructure Ltd., 2018
SCC OnLine NCDRC 1164] held that the clauses relied upon by the builder
were wholly one-sided, unfair and unreasonable, and could not be relied
upon. The Law Commission of India in its 199th Report, addressed the
issue of ―Unfair (Procedural & Substantive) Terms in Contract‖. The Law
Commission inter alia recommended that a legislation be enacted to
4
(2019) 5 SCC 725.
34
counter such unfair terms in contracts. In the draft legislation provided in the
Report, it was stated that:
―… a contract or a term thereof is substantively unfair if such
contract or the term thereof is in itself harsh, oppressive or
unconscionable to one of the parties.‖
6.8. A term of a contract will not be final and binding if it is shown that the
flat purchasers had no option but to sign on the dotted line, on a contract
framed by the builder. The contractual terms of the agreement dated 8-5-
2012 are ex facie one-sided, unfair and unreasonable. The incorporation of
such one-sided clauses in an agreement constitutes an unfair trade practice
as per Section 2(1)(r) of the Consumer Protection Act, 1986 since it adopts
unfair methods or practices for the purpose of selling the flats by the
builder.‖
19.5 In a similar case, this Court in Wg. Cdr. Arifur Rahman Khan & Others
v. DLF Southern Homes Pvt. Ltd.,
5
affirmed the view taken in Pioneer (supra),
and held that the terms of the agreement authored by the Developer does not
maintain a level platform between the Developer and the flat purchaser. The
stringent terms imposed on the flat purchaser are not in consonance with the
obligation of the Developer to meet the timelines for construction and handing
over possession, and do not reflect an even bargain. The failure of the
Developer to comply with the contractual obligation to provide the flat within
the contractually stipulated period, would amount to a deficiency of service.
Given the one-sided nature of the Apartment Buyer‘s Agreement, the
consumer fora had the jurisdiction to award just and reasonable
compensation as an incident of the power to direct removal of deficiency in
service.
19.6 Section 14 of the 1986 Act empowers the Consumer Fora to redress
the deficiency of service by issuing directions to the Builder, and compensate
5
2020 SCC Online SC 667.
35
the consumer for the loss or injury caused by the opposite party, or discontinue
the unfair or restrictive trade practices.
19.7 We are of the view that the incorporation of such one-sided and
unreasonable clauses in the Apartment Buyer‘s Agreement constitutes an
unfair trade practice under Section 2(1)(r) of the Consumer Protection Act.
Even under the 1986 Act, the powers of the consumer fora were in no manner
constrained to declare a contractual term as unfair or one-sided as an incident
of the power to discontinue unfair or restrictive trade practices. An ―unfair
contract‖ has been defined under the 2019 Act, and powers have been
conferred on the State Consumer Fora and the National Commission to declare
contractual terms which are unfair, as null and void. This is a statutory
recognition of a power which was implicit under the 1986 Act.
In view of the above, we hold that the Developer cannot compel the
apartment buyers to be bound by the one-sided contractual terms contained in
the Apartment Buyer‘s Agreement.
20. Whether primacy to be given to RERA over the Consumer Protection Act
20.1 The Consumer Protection Act, 1986 was enacted to protect the
interests of consumers, and provide a remedy for better protection of the
interests of consumers, including the right to seek redressal against unfair
trade practices or unscrupulous exploitation.
The Statement of Objects and Reasons of the Consumer Protection
Bill, 1986 reads as :
“STATEMENT OF OBJECTS AND REASONS
36
The Consumer Protection Bill, 1986 seeks to provide for better protection of the
interests of consumers and for the purpose, to make provision for the establishment
of Consumer councils and other authorities for the settlement of consumer disputes
and for matter connected therewith.
2. It seeks, inter alia, to promote and protect the rights of consumers such as:—
(a) the right to be protected against marketing of goods which are hazardous to life
and property;
(b) the right to be informed about the quality, quantity, potency, purity, standard and
price of goods to protect the consumer against unfair trade practices;
(c) the right to be assured, wherever possible, access to an authority of goods at
competitive prices;
(d) the right to be heard and to be assured that consumers interests will receive due
consideration at appropriate forums;
(e) the right to seek redressal against unfair trade practices or unscrupulous
exploitation of consumers; and
(f) right to consumer education.
3. These objects are sought to be promoted and protected by the Consumer
Protection Council to be established at the Central and State level.
4. To provide speedy and simple redressal to consumer disputes, a quasi-judicial
machinery is sought to be set up at the district, State and Central levels. These
quasi-judicial bodies will observe the principles of natural justice and have been
empowered to give relief of a specific nature and to award, wherever appropriate,
compensation to consumers. Penalties for non-compliance of the orders given by the
quasi-judicial bodies have also been provided.‖
(emphasis supplied)
20.2 Section 3 of the Consumer Act provides that the remedies under the
Act are in addition to, and not in derogation of any other law applicable.
Section 3 reads as :
―3. Act not in derogation of any other law.—The provisions of this Act
shall be in addition to and not in derogation of the provisions of any other
law for the time being in force.‖
In Secretary, Thirumurugan Cooperative Agricultural Credit Society v.
M. Lalitha (dead) through LRs and others,
6
this Court held that:
―11. From the Statement of Objects and Reasons and the scheme of the
1986 Act, it is apparent that the main objective of the Act is to provide for
6
(2004) 1 SCC 305.
37
better protection of the interest of the consumer and for that purpose to
provide for better redressal, mechanism through which cheaper, easier,
expeditious and effective redressal is made available to consumers. To
serve the purpose of the Act, various quasijudicial forums are set up at the
district, State and national level with wide range of powers vested in them.
These quasi-judicial forums, observing the principles of natural justice, are
empowered to give relief of a specific nature and to award, wherever
appropriate, compensation to the consumers and to impose penalties for
non-compliance with their orders.
12. As per Section 3 of the Act, as already stated above, the provisions of
the Act shall be in addition to and not in derogation of any other provisions
of any other law for the time being in force. Having due regard to the
scheme of the Act and purpose sought to be achieved to protect the interest
of the consumers better, the provisions are to be interpreted broadly,
positively and purposefully in the context of the present case to give
meaning to additional/extended jurisdiction, particularly when Section 3
seeks to provide remedy under 19 the Act in addition to other remedies
provided under other Acts unless there is a clear bar.‖
In National Seeds Corporation Limited v. M. Madhusudhan Reddy,7
the
jurisdiction of the District Consumer forum was challenged on the ground that
there was an arbitration clause in the Agreement between the parties. It was
contended that the provisions of the Seeds Act, 1966 would prevail over the
Consumer Protection Act. Relevant extracts of the ruling are extracted
hereinunder :
“57. It can thus be said that in the context of farmers/growers and other
consumers of seeds, the Seeds Act is a special legislation insofar as the
provisions contained therein ensure that those engaged in agriculture and
horticulture get quality seeds and any person who violates the provisions of
the Act and/or the Rules is brought before the law and punished. However,
there is no provision in that Act and the Rules framed thereunder for
compensating the farmers, etc. who may suffer adversely due to loss of
crop or deficient yield on account of defective seeds supplied by a person
authorised to sell the seeds. That apart, there is nothing in the Seeds Act
and the Rules which may give an indication that the provisions of the
Consumer Protection Act are not available to the farmers who are otherwise
covered by the wide definition of ―consumer‖ under Section 2(1)(d) of the
Consumer Protection Act. As a matter of fact, any attempt to exclude the
farmers from the ambit of the Consumer Protection Act by implication will
make that Act vulnerable to an attack of unconstitutionality on the ground of
discrimination and there is no reason why the provisions of the Consumer
Protection Act should be so interpreted.
7
(2012) 2 SCC 506.
38
….
62. Since the farmers/growers purchased seeds by paying a price to the
appellant, they would certainly fall within the ambit of Section 2(1)(d)(i) of
the Consumer Protection Act and there is no reason to deny them the
remedies which are available to other consumers of goods and services.‖
….
64. According to the learned counsel for the appellant, if the growers had
applied for arbitration then in terms of Section 8 of the Arbitration and
Conciliation Act the dispute arising out of the arbitration clause had to be 23
referred to an appropriate arbitrator and the District Consumer Forums were
not entitled to entertain their complaint. This contention represents an
extension of the main objection of the appellant that the only remedy
available to the farmers and growers who claim to have suffered loss on
account of use of defective seeds sold/supplied by the appellant was to file
complaints with the Seed Inspectors concerned for taking action under
Sections 19 and/or 21 of the Seeds Act.
66. The remedy of arbitration is not the only remedy available to a grower.
Rather, it is an optional remedy. He can either seek reference to an
arbitrator or file a complaint under the Consumer Protection Act. If the
grower opts for the remedy of arbitration, then it may be possible to say that
he cannot, subsequently, file complaint under the Consumer Protection Act.
However, if he chooses to file a complaint in the first instance before the
competent Consumer Forum, then he cannot be denied relief by invoking
Section 8 of the Arbitration and Conciliation Act, 1996. Moreover, the plain
language of Section 3 of the Consumer Protection Act makes it clear that
the remedy available in that Act is in addition to and not in derogation of the
provisions of any other law for the time being in force.‖
Subsequently, the judgments in Thirumurugan Cooperative Agricultural
Society (Supra) and National Seeds were followed in Virender Jain v.
Alaknanda Cooperative Group Housing Society Limited and others.
8
20.3 Various judgments of this Court have upheld the applicability of
provisions of Consumer Protection Act as an additional remedy, despite the
existence of remedies under special statutes, including the Arbitration and
Conciliation Act, 1996. In Emaar MGF Land Ltd. v. Aftab Singh,9
this Court
has held that the remedy under the Consumer Protection Act, 1986 is
8
(2013) 9 SCC 383.
9
(2019) 12 SCC 751.
39
confined to the Complaint filed by a Consumer as defined by the Act, for
defects and deficiency caused by the service provider. The existence of an
arbitration clause was not a ground to restrain the Consumer Fora from
proceeding with the consumer complaint.
20.4 We will now consider the provisions of the RERA Act, which was
brought into force on 01.05.2016.
The Statement of Objects and Reasons of the RERA Act, 2016 read as
follows :
―THE STATEMENT OF OBJECTS AND REASONS
The real estate sector plays a catalytic role in fulfilling the need and demand
for housing and infrastructure in the country. While this sector has grown
significantly in recent years, it has been largely unregulated, with absence
of professionalism and standardisation and lack of adequate consumer
protection. Though the Consumer Protection Act, 1986 is available as a
forum to the buyers in the real estate market, the recourse is only curative
and is not adequate to address all the concerns of buyers and promoters in
that sector. The lack of standardisation has been a constraint to the healthy
and orderly growth of industry. Therefore, the need for regulating the sector
has been emphasised in various forums.
In view of the above, it becomes necessary to have a Central legislation,
namely, the Real Estate (Regulation and Development) Bill, 2013 in the
interests of effective consumer protection, uniformity and standardisation of
business practices and the transactions in the real estate sector. The
proposed Bill provides for the establishment of the Real Estate Regulatory
Authority (the Authority) for regulation and promotion of real estate sector
and to ensure sale of plot, apartment or building, as the case may be, in an
efficient and transparent manner and to protect the interest of consumers in
real estate sector and establish the Real Estate Appellate Tribunal to hear
appeals from the decisions, directions or orders of the Authority.
(emphasis supplied)
20.5 Section 18 of the RERA Act, 2016 provides the remedy of refund with
interest and compensation to allottees, when a Developer fails to complete
the construction or give possession as per the Agreement of Sale. The
remedies under Section 18 are ―without prejudice to any other remedy
available‖.
40
20.6 Section 71 of the RERA Act empowers the RERA Authority to
determine compensation payable under Sections 12, 14, 18 and 19 of the
Act. The proviso to Section 71 provides that a consumer has the right to
withdraw its complaint before the consumer fora in respect of matters covered
under Sections 12, 14, 18 and 19 of the Act, and file the same before the
RERA.
Section 71 reads as :
―71. Power to adjudicate. – (1) For the purpose of adjudging
compensation under sections 12, 14, 18 and section 19, the Authority shall
appoint, in consultation with the appropriate Government, one or more
judicial officer as deemed necessary, who is or has been a District Judge to
be an adjudicating officer for holding an inquiry in the prescribed manner,
after giving any person concerned a reasonable opportunity of being heard:
Provided that any person whose complaint in respect of matters covered
under sections 12, 14, 18 and section 19 is pending before the Consumer
Disputes Redressal Forum or the Consumer Disputes Redressal
Commission or the National Consumer Redressal Commission, established
under section 9 of the Consumer Protection Act, 1986 (68 of 1986), on or
before the commencement of this Act, he may, with the permission of such
Forum or Commission, as the case may be, withdraw the complaint
pending before it and file an application before the adjudicating officer
under this Act‖.
20.7 Section 79 of the RERA Act bars the jurisdiction only of civil courts in
respect of matters which an authority constituted under the RERA Act is
empowered to adjudicate on.
Section 79 reads as :
“79. Bar of jurisdiction: No civil court shall have jurisdiction to entertain
any suit or proceeding in respect of any matter which the Authority or the
adjudicating officer or the Appellate Tribunal is empowered by or under this
Act to determine and no injunction shall be granted by any court or other
authority in respect of any action taken or to be taken in pursuance of any
power conferred by or under this Act.‖
20.8 Section 88 of the RERA Act is akin to Section 3 of the Consumer
Protection Act, and provides that the provisions of the RERA Act shall apply in
41
in addition to and not in derogation of other applicable laws. Section 88 reads
as :
―88. Application of other law not barred: The provisions of this Act shall
be in addition to, and not in derogation of, the provisions of any other law for
the time being in force.‖
20.9 An allottee may elect or opt for one out of the remedies provided by
law for redressal of its injury or grievance. An election of remedies arises
when two concurrent remedies are available, and the aggrieved party
chooses to exercise one, in which event he loses the right to simultaneously
exercise the other for the same cause of action.
20.10 The doctrine of election was discussed in A.P. State Financial
Corporation v. M/s GAR Re-rolling Corporation,10 in the following words :
―15. The Doctrine of Election clearly suggests that when two remedies are
available for the same relief, the party to whom the said remedies are
available has the option to elect either of them but that doctrine would not
apply to cases where the ambit and scope of the two remedies is
essentially different. To hold otherwise may lead to injustice and
inconsistent results. …. Since, the Corporation must be held entitled and
given full protection by the Court to recover its dues it cannot be bound
down to adopt only one of the two remedies provided under the Act. In our
opinion the Corporation can initially take recourse to Section 31 of the Act
but withdraw or abandon it at any stage and take recourse to the provisions
of Section 29 of the Act, which section deals with not only the rights but
also provides a self-contained remedy to the Corporation for recovery of its
dues. If the Corporation chooses to take recourse to the remedy available
under Section 31 of the Act and pursues the same to the logical conclusion
and obtains an order or decree, it may thereafter execute the order or
decree, in the manner provided by Section 32(7) and (8) of the Act. The
Corporation, however, may withdraw or abandon the proceedings at that
stage and take recourse to the provisions of Section 29 of the Act. A
‗decree‘ under Section 31 of the Act not being a money decree or a decree
for realisation of the dues of the Corporation, as held in Gujarat State
Financial Corpn. v. Naatson Mfg. Co. P. Ltd. [(1979) 1 SCC 193, 198 : AIR
1978 SC 1765, 1768] recourse to it cannot debar the Corporation from
taking recourse to the provisions of Section 29 of the Act by not persuing
the decree or order under Section 31 of the Act, in which event the order
made under Section 31 of the Act would serve in aid of the relief available
under Section 29 of the Act
10 (1994) 2 SCC 647.
42
16. The doctrine of election, as commonly understood, would, thus, not be
attracted under the Act in view of the express phraseology used in Section
31 of the Act, viz., ―without prejudice to the provisions of Section 29 of this
Act‖. While the Corporation cannot simultaneously pursue the two
remedies, it is under no disability to take recourse to the rights and remedy
available to it under Section 29 of the Act even after an order under Section
31 has been obtained but without executing it and withdrawing from those
proceedings at any stage. The use of the expression ―without prejudice to
the provisions of Section 29 of the Act‖ in Section 31 cannot be read to
mean that the Corporation after obtaining a final order under Section 31 of
the Act from a court of competent jurisdiction, is denuded of its rights under
Section 29 of the Act. To hold so would render the above-quoted
expression redundant in Section 31 of the Act and the courts do not lean in
favour of rendering words used by the Legislature in the statutory
provisions redundant. The Corporation which has the right to make the
choice may make the choice initially whether to proceed under Section 29
of the Act or Section 31 of the Act, but its rights under Section 29 of the Act
are not extinguished, if it decides to take recourse to the provisions of
Section 31 of the Act. It can abandon the proceedings under Section 31 of
the Act at any stage, including the stage of execution, if it finds it more
practical, and may initiate proceedings under Section 29 of the Act.‖
The doctrine of election is based on the rule of estoppel. In P.R.
Deshpande v. Maruti Balaram Haibatti,
11 it was held that :
“8. The doctrine of election is based on the rule of estoppel — the
principle that one cannot approbate and reprobate inheres in it. The
doctrine of estoppel by election is one of the species of estoppel in pais
(or equitable estoppel) which is a rule in equity. By that rule, a person may
be precluded by his actions or conduct or silence when it is his duty to
speak, from asserting a right which he otherwise would have had. (vide
Black's Law Dictionary, 5th Edn.)‖
In National Insurance Co. Ltd. v. Mastan & Ors.,
12 claims for
compensation were filed both under the Workmen‘s Compensation Act, 1923
and the Motor Vehicles Act, 1988. This Court held that the doctrine of election
was incorporated in Section 167 of the Motor Vehicles Act. The relevant
extract from the judgment reads as follows :
‗23. The ―doctrine of election‖ is a branch of ―rule of estoppel‖, in terms
whereof a person may be precluded by his actions or conduct or silence
when it is his duty to speak, from asserting a right which he otherwise
would have had. The doctrine of election postulates that when two
11 (1998) 6 SCC 507.
12 (2006) 2 SCC 641.
43
remedies are available for the same relief, the aggrieved party has the
option to elect either of them but not both. Although there are certain
exceptions to the same rule but the same has no application in the instant
case.
….
27. The first respondent having chosen the forum under the 1923 Act for
the purpose of obtaining compensation against his employer cannot now
fall back upon the provisions of the 1988 Act therefor, inasmuch as the
procedure laid down under both the Acts are different save and except
those which are covered by Section 143 thereof.
33. On the establishment of a Claims Tribunal in terms of Section 165 of
the Motor Vehicles Act, 1988, the victim of a motor accident has a right to
apply for compensation in terms of Section 166 of that Act before that
Tribunal. On the establishment of the Claims Tribunal, the jurisdiction of
the civil court to entertain a claim for compensation arising out of a motor
accident, stands ousted by Section 175 of that Act. Until the establishment
of the Tribunal, the claim had to be enforced through the civil court as a
claim in tort. The exclusiveness of the jurisdiction of the Motor Accidents
Claims Tribunal is taken away by Section 167 of the Motor Vehicles Act in
one instance, when the claim could also fall under the Workmen's
Compensation Act, 1923. That section provides that death or bodily injury
arising out of a motor accident which may also give rise to a claim for
compensation under the Workmen's Compensation Act, can be enforced
through the authorities under that Act, the option in that behalf being with
the victim or his representative. But Section 167 makes it clear that a
claim could not be maintained under both the Acts. In other words, a
claimant who becomes entitled to claim compensation under both the
Motor Vehicles Act, 1988 and the Workmen's Compensation Act, because
of a motor vehicle accident has the choice of proceeding under either of
the Acts before the forum concerned. By confining the claim to the
authority or the Tribunal under either of the Acts, the legislature has
incorporated the concept of election of remedies, insofar as the claimant is
concerned. In other words, he has to elect whether to make his claim
under the Motor Vehicles Act, 1988 or under the Workmen's
Compensation Act, 1923. The emphasis in the section that a claim cannot
be made under both the enactments, is a further reiteration of the doctrine
of election incorporated in the scheme for claiming compensation. The
principle ―where, either of the two alternative Tribunals are open to a
litigant, each having jurisdiction over the matters in dispute, and he resorts
for his remedy to one of such Tribunals in preference to the other, he is
precluded, as against his opponent, from any subsequent recourse to the
latter‖ (see R. v. Evans [(1854) 3 E & B 363 : 118 ER 1178] ) is fully
incorporated in the scheme of Section 167 of the Motor Vehicles Act,
precluding the claimant who has invoked the Workmen's Compensation
Act from having resort to the provisions of the Motor Vehicles Act, except
to the limited extent permitted therein. The claimant having resorted to the
Workmen's Compensation Act, is controlled by the provisions of that Act
subject only to the exception recognised in Section 167 of the Motor
Vehicles Act.‖
(emphasis supplied)
44
In Transcore v. Union of India,
13 this Court considered the provisions of
the Securitisation and Reconstruction of Financial Assets and Enforcement of
Securities Interest Act, 2002 (―SARFAESI Act‖) and the Recovery of Debts
due to Banks and Financial Institutions Act, 1993 (―RDDB Act‖), wherein it
was held that there are three elements of election viz. existence of two or
more remedies, inconsistencies between such remedies, and a choice of one
of them. If any one of the three elements is not there, the doctrine will not
apply.
The judgment in Transcore was subsequently followed in Mathew
Varghese v. M. Amritha Kumar,14 where it was held that :
“46. A reading of Section 37 discloses that the application of the
SARFAESI Act will be in addition to and not in derogation of the provisions
of the RDDB Act. In other words, it will not in any way nullify or annul or
impair the effect of the provisions of the RDDB Act. We are also fortified
by our above statement of law as the heading of the said section also
makes the position clear that application of other laws are not barred. The
effect of Section 37 would, therefore, be that in addition to the provisions
contained under the Sarfaesi Act, in respect of proceedings initiated under
the said Act, it will be in order for a party to fall back upon the provisions of
the other Acts mentioned in Section 37, namely, the Companies Act,
1956, the Securities Contracts (Regulation) Act, 1956, the Securities and
Exchange Board of India Act, 1992, the Recovery of Debts Due to Banks
and Financial Institutions Act, 1993, or any other law for the time being in
force.‖
20.11 In a recent judgment delivered by this Court in M/s Imperia Structures
Ltd. v. Anil Patni and Anr,
15 it was held that remedies under the Consumer
Protection Act were in addition to the remedies available under special
statutes. The absence of a bar under Section 79 of the RERA Act to the
initiation of proceedings before a fora which is not a civil court, read with
13 (2008) 1 SCC 125.
14 (2014) 5 SCC 610.
15 (2020) 10 SCC 783.
45
Section 88 of the RERA Act makes the position clear. Section 18 of the RERA
Act specifies that the remedies are ―without prejudice to any other remedy
available‖. We place reliance on this judgment, wherein it has been held that :
“31. Proviso to Section 71(1) of the RERA Act entitles a complainant who
had initiated proceedings under the CP Act before the RERA Act came
into force, to withdraw the proceedings under the CP Act with the
permission of the Forum or Commission and file an appropriate
application before the adjudicating officer under the RERA Act. The
proviso thus gives a right or an option to the complainant concerned but
does not statutorily force him to withdraw such complaint nor do the
provisions of the RERA Act create any mechanism for transfer of such
pending proceedings to authorities under the RERA Act. As against that
the mandate in Section 12(4) of the CP Act to the contrary is quite
significant.
32. Again, insofar as cases where such proceedings under the CP Act are
initiated after the provisions of the RERA Act came into force, there is
nothing in the RERA Act which bars such initiation. The absence of bar
under Section 79 to the initiation of proceedings before a fora which
cannot be called a civil court and express saving under Section 88 of the
RERA Act, make the position quite clear. Further, Section 18 itself
specifies that the remedy under the said section is ―without prejudice to
any other remedy available‖. Thus, the parliamentary intent is clear that a
choice or discretion is given to the allottee whether he wishes to initiate
appropriate proceedings under the CP Act or file an application under the
RERA Act.‖
21. Whether the Apartment Buyers are entitled to terminate the Agreement,
or refund of the amount deposited with Delay Compensation.
21.1 The issue which now arises is whether the apartment buyers are bound
to accept the offer of possession made by the Developer where the
Occupation Certificate has been issued, along with the payment of Delay
Compensation, or are entitled to terminate the Agreement.
The factum of delay in completing the construction and making the
offer of possession is an undisputed fact in this case.
21.2 In the present case, the allottees before this Court in the present batch
of appeals, can be categorised into two categories:-
46
i) Apartment Buyers whose allotments fall in Phase 1 of the
project comprised in Towers A6 to A10, B1 to B4, and C3
to C7, where the Developer has been granted occupation
certificate, and offer of possession has been made, are
enlisted in Chart A;
ii) Apartment Buyers whose allotments fall in Phase 2 of the
project, where the allotments are in Towers A1 to A5, B5
to B8, C8 to C11, where the Occupation Certificate has
not been granted so far, are set out in Chart B below.
47
CHART A
APARTMENTS WHERE O.C. OBTAINED BY DEVELOPER
S.
No.
Cause Title &
Civil Appeal No.
Particulars of
Allotment
Sale Consideration
Amount Paid
by the
Apartment
Buyer on the
date of filing of
Complaint
Possession of
Flat offered on
Status
1 C.A. No.5785/2019
IREO Grace
Realtech Private
Ltd.
v. Abhishek
Khanna
Unit CD-C4-04-402
Tower C4
Rs.1,45,22,006/-
Rs.
1,44,72,364/-
Possession
offered on
28.06.2019
2 C.A. No.8480/2019
IREO Grace
Realtech Private
Ltd. v.
Promila Kashyap &
Another
Unit CD-B3-09-904
Tower B3
Rs.1,73,06,088.42/-
Rs.
1,70,32,041/-
Possession
offered on
28.06.2019.
3. C.A. No.3064/2020
Parvesh Maggoo v.
IREO Grace
Realtech Pvt. Ltd.
Unit CD-A6-02-203
Tower A6
Rs.1,70,08,0261.56/-
Rs.1,59,29,016/- Possession
offered on
14.06.2019
An Affidavit
dt.16.09.2019
was filed by the
Developer before
the National
Company Law
Tribunal
undertaking to
refund the
principal amount
of
Rs.1,59,29,016/
to the Apartment
Buyer.
However, the
Developer has
not refunded the
amount so far.
48
CHART B
APARTMENTS WHERE NO O.C. AVAILABLE EVEN AS ON DATE
S.
No.
Cause Title & Civil
Appeal No.
Particulars of
Allotment
Sale
Consideration
Amount Paid by
the Apartment
Buyer on the
date of filing of
Complaint
Status of construction
1. C.A. No. 7615/2019
IREO Grace Realtech
Private Ltd. vs
Daraksha Khan
Unit CD-A2-03-301
Tower A2
Rs. 1,96,01,772/-
Rs. 60,60,828/- on
28.10.2016
After filing the Complaint, the
4
th demand for casting of
Lower Basement Slab was
demanded on 1.2.2017.
No O.C. even on date.
2. C.A. No.8482/2019
IREO Grace Realtech
Private Ltd. v.
Gunish Chawla
Unit CD-C9-03-303
Tower C9
Rs. 1,55,72,177/-
Rs. 1,43,07,009/-
on 28.02.2017.
No O.C. even on date.
3. C.A. No.7975/2019
IREO Grace Realtech
Private Ltd. v.
Amit Arora
Unit CD-A3-06-603
Tower A3
Rs. 1,92,17,760/-
Rs. 1,80,50,068/-
on 10.03.2017
Instalment No.10 for casting of
Top Floor Roof Slab was
raised on 07.03.2017
No O.C. even on date.
4. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Pradeep Kumar
Gupta
Unit CD-A1-06-601
Tower A1
Rs. 1,99,20,649/-
Rs. 61,22,733/- on
20.01.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
5. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Monica Khuller
Unit CD-A2-11-
1102
Tower A2
Rs. 2,01,86,365/-
Rs. 62,05,441 as
on 24.01.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
6. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Unit CD-A1-08-802
Tower A1
Rs. 1,99,20,649/-
Rs. 61,22,738/- The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
49
Neelam Mittal No O.C. even on date.
7. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Shiladitya
Gangopadhya
Unit CD-A1-04-401
Tower A1
Rs. 2,02,71,389/-
Rs. 62,09,828/-
On 24.01.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
8. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Kartik Ahuja
Unit CD-A2-03-302
Tower A2
Rs. 2,01,86,365/-
Rs. 62,05,440/-
On 23.02.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
9. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Gagan Preet Singh
Unit CD-A1-12-
1201
Tower A1
Rs. 2,02,92,883/-
Rs. 62,38,594/-
On 23.02.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
10. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Raman Narula
Unit CD-A2-09-903
Tower A2
Rs. 1,89,41,277/-
Rs. 58,55,695/-
On 23.02.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
11. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Priyanka Gupta
Unit CD-A2-05-501
Tower A2
Rs. 1,84,06,981/-
Rs. 56,88,308/-
On 23.02.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
12. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Raj Sethi
Unit CD-A2-03-303
Tower A2
Rs. 1,89,41,277/-
Rs. 58,55,696/-
On 23.02.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
13. C.A. 8785-8794/2019
IREO Grace Realtech
Private Ltd. v.
Kunal Wadhwa
Unit CD-A1-11-
1102
Tower A1
Rs. 2,02,92,883/-
Rs. 62,38,595/-
On 23.02.2017
The 4th demand for casting of
Lower Basement Slab was
raised on 10.01.2017.
No O.C. even on date.
14. C.A. 8454/2019 Unit CD-B7-07-704 Rs. 1,16,87,089/- No O.C. even on date.
50
IREO Grace Realtech
Private Ltd. v.
Vishal Dua
Tower B7
Rs.
1,38,83,798.04/-
15. C.A. 9139/2019
IREO Grace Realtech
Private Ltd. v.
Mukesh Makkar
Unit CD-C11-06-
602
Tower C11
Rs.
1,56,79,491.91/-
Rs. 1,44,87,344/- No O.C. even on date.
16. C.A. 9216/2019
IREO Grace Realtech
Private Ltd. v.
Ritu Hasija
Unit CD-A1-01-102
Tower A1
Rs. 2,02,71,389.77
/-
Rs. 63,29,440/- No O.C. even on date.
17. C.A. 9638/2019
IREO Grace Realtech
Private Ltd. v.
Prabhat Kumar
Swami
Unit CD-A2-06-601
Tower A2
Rs. 1,84,06,981.50
/-
Rs. 57,09,566/- After filing of complaint, the 4th
instalment for casting of lower
basement slab was demanded
on 01.02.2017.
No O.C. even on date.
Chart A allottees
(i) We are of the view that allottees at Serial Nos. 1 and 2 in Chart A are
obligated to take possession of the apartments, since the construction was
completed, and possession offered on 28.06.2019, after the issuance of
Occupation Certificate on 31.05.2019. The Developer is however obligated to
pay Delay Compensation for the period of delay which has occurred from
27.11.2018 till the date of offer of possession was made to the allottees.
(ii) Insofar as the allottee at Serial No.3 in Chart A is concerned, he has
filed Civil Appeal No.3064 of 2020 under Section 62 of the Insolvency and
Bankruptcy Code, 2016 before this Court. We were informed by the Counsel
51
for the allottee that the Developer had filed an affidavit dated 16.09.2019
before the National Company Law Tribunal (―NCLT‖) stating that it was willing
to refund the principal amount of Rs.1,59,29,016/- in four equal instalments,
and had produced photocopy of the cheques. The relevant portion of the
affidavit filed by the Developer before the NCLT is extracted hereunder :-
―3. Without prejudice to contentions and averments raised during the
course of arguments by the Corporate Debtor, the Corporate Debtor
explored the possibility of the settlement with the Petitioner and had offered
to pay the entire principal amount i.e. 1,59,29,016/- in a time bound manner
by way of 4 equal instalments, wherein 1st instalment starting from
16.09.2019. Copy of the Cheques by the Corporate Debtor for payment of
the principal amount in full is annexed herewith and marked as AnnexureA.‖
Despite the said Undertaking given before the NCLT, the Developer
has failed to refund even the principal amount so far.
We direct the Developer to refund the amount deposited by the said
Appellant within a period 4 weeks from the date of this judgment with interest
@ 9% p.a. from 16.09.2019 (date of the affidavit filed by the Developer before
the NCLT). If this direction is not complied with, the Developer will be liable to
pay Default Interest @12% p.a. on the entire amount.
Chart B allottees
(i) Insofar as the allottees in Chart B are concerned, they have paid part
consideration, in most cases up to the 4th instalment till 2017, when they
found that there was no progress being made in respect of the Towers in
which the apartments had been allotted to them. It is an admitted position that
Occupation Certificate for Towers A1, A2, A3, B7, C9 and C11, in which the
allotments have been made for this category has not been issued by the
Municipal Corporation.
52
The apartments have not been ready for allotment even as on
30.06.2020, as per the date fixed before the RERA Authority.
(ii) The allottees submitted that they were facing great hardship since they
had obtained loans from Banks for purchasing these apartments, and were
paying high rates of interest. In 2017, when they realised that there was no
construction activity in progress, they were constrained to file consumer
complaints before the National Commission, and then discontinued payment
of further instalments.
(iii) The Developer made an alternate offer of allotment of apartments in
Phase 1 of the project. The allottees are however not bound to accept the
same because of the inordinate delay in completing the construction of the
Towers where units were allotted to them. The Occupation Certificate is not
available even as on date, which clearly amounts to deficiency of service.
The allottees cannot be made to wait indefinitely for possession of the
apartments allotted to them, nor can they be bound to take the apartments in
Phase 1 of the project. The allottees have submitted that they have taken
loans, and are paying high rates of interest to the tune of 7.9% etc. to the
Banks.
Consequently, we hold that the allottees in Chart B are entitled to
refund of the entire amount deposited by them.
(iv) In so far as award of compensation by payment of Interest is
concerned, clause 13.4 of the Apartment Buyer‘s Agreement provides that the
Developer shall be liable to pay the allottee compensation calculated @ Rs.
53
7.5 per sq. ft. of the Super Area for every month of delay, after the end of the
Grace Period. The compensation will be payable only for a period of 12
months.
The Apartment Buyers in their Complaint filed before the National
Commission made a prayer for refund of the amount deposited alongwith
Interest @ 20% p.a. compounding quarterly till its realisation. The Apartment
Buyers, in their submissions have stated that they have obtained home loans
on which Interest @ 7.90% p.a. is being paid, even as on date.
We have considered the rival submissions made by both the parties.
The Delay Compensation specified in the Apartment Buyer‘s Agreement of
Rs. 7.5 per sq. ft. which translates to 0.9% to 1% p.a. on the amount
deposited by the Apartment Buyer cannot be accepted as being adequate
compensation for the delay in the construction of the project. At the same
time, we cannot accept the claim of the Apartment Buyers for payment of
compound interest @ 20% p.a., which has no nexus with the commercial
realities of the prevailing market. We have also taken into consideration that
in Subodh Pawar v. IREO Grace, this Court recorded the statement of the
Counsel for the Developer that the amount would be refunded with Interest @
10% p.a. A similar order was passed in the case of IREO v. Surendra Arora.
However, the Order in these cases were passed prior to the out-break of the
pandemic.
We are cognizant of the prevailing market conditions as a result of
Covid–19 Pandemic, which have greatly impacted the construction industry.
54
In these circumstances, it is necessary to balance the competing
interest of both parties. We think it would be in the interests of justice and
fairplay that the amounts deposited by the Apartment Buyers is refunded with
Interest @ 9% S.I. per annum from 27.11.2018 till the date of payment of the
entire amount.
The refund will be paid within a period of three months from the date of
this judgment. If there is any further delay, the Developer will be liable to pay
default interest @ 12% S.I. p.a.
(v) The Developer shall not deduct the Earnest Money of 20% from the
principal amount, or any other amount as mentioned in Clause 21.3 of the
Agreement, on account of the various defaults committed by the Developer,
including the delay of over 7 months in obtaining the Fire NOC.
(vi) In Civil Appeal No.9139 of 2019, we were informed by the learned
counsel that the Respondent had made a request for refund of the amount
deposited since his wife was critical and required a lung transplant, to meet
the huge expenses of hospitalisation. However, the Developer failed to refund
the amount. During the pendency of proceedings, the wife has since expired
on 08.12.2020, and there are pending hospital bills to the tune of Rs.50 to 60
lakhs to be cleared.
We direct the Developer to refund the entire amount deposited by this
respondent alongwith Interest @ 9% S.I. p.a. within a period of 4 weeks from
the date of this judgment. The failure to refund the amount within 4 weeks will
55
make the Developer liable for payment of default interest @ 12% S.I. p.a. till
the payment is made.
The Civil Appeals are accordingly disposed of, with no order as to
costs. All pending applications are disposed of.
Ordered accordingly.
….................................................J.
(Dr Dhananjaya Y Chandrachud)
….................................................J.
(Indu Malhotra)
….................................................J.
(Indira Banerjee)
New Delhi;
January 11, 2021